Quantitative Software Management

Quantitative Software Management

SLIM-Estimate Files

LEARN ABOUT OUR PROJECT MANAGEMENT SOLUTIONS FOR SOFTWARE DEVELOPMENT

   
  winzip iconGet Winzip

SLIM-Estimate 7.0 Upgrade

 

Licensed SLIM-Estimate 7.0 users

Note: To install this upgrade you must first be running SLIM Suite 7.0. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder (the default location is c:Program FilesQSMTools70). For more information on specific fixes or enhancements included in this upgrade, see the Suite_70Changes.doc file in the SLIM-Estimate 7.0 Upgrade zip file.

GET PASSWORD

SLIM-Estimate 7.0 Upgrade (1.97 MB)

SEstimat_70.zip
  winzip iconGet Winzip

SLIM-Estimate 7.0 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Estimate 7.0 Users Manual (6.75 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SEstimat70 .zip
  winzip iconGet Winzip

SLIM-Estimate 7.0 API Documentation

 

Licensed Users Only
The API download requires a different password - be sure to use the API password provided.SLIM-SUITE 7.0 Application Programmers Interface Documentation(6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-Estimate, consult the Readme.doc file.

GET PASSWORD

 

QSMAPI70.zip
  winzip iconGet Winzip

SLIM-Estimate 6.3b Upgrade

 

Licensed SLIM-Estimate 6.3 users
Note: To install this upgrade you must first be running SLIM Suite 6.3a or b. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools63). For more information on specific fixes or enhancements included in this upgrade, see the Suite_63bChanges.doc file in the SLIM-Estimate 6.3b Upgrade zip file (SEST63b.zip).

GET PASSWORD

SLIM-Estimate 6.3b Upgrade (1.97 MB)

SEST63b.zip

SLIM-Estimate 6.3 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Estimate 6.3 Users Manual (6.99 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SEstimat63 .zip

SLIM-Estimate 6.3 API Documentation

 

Licensed Users Only
The API download requires a different password - be sure to use the API password provided.SLIM-SUITE 6.3 Application Programmers Interface Documentation

GET PASSWORD

 

QSMAPI63.zip

2005 Trend Line Updates

 

Licensed SLIM-Estimate 6.1 users (6.3 users will have the 2005 trends automatically).
The 2005 Trend Line Update upgrades the PI, MBI and trend line runtime files used by SLIM-Estimate 6.1. To install the trends, download and unzip the 05SEtrends.zip (648 KB) into the directory where SLIM-Estimate is installed. After updating, you will still have access to the 2002 trends. See the UpdatingSLIMTrends.doc file in the zip file for more information about the upgrade.

GET PASSWORD

 

05SEtrends.zip

SLIM-Estimate 6.1 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Estimate 6.1 Users Manual (5.43 MB)in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

 

SEstimat- master.zip



SLIM-Control Files

Back to top

   
  winzip iconGet Winzip

SLIM-Control 7.0 Upgrade

 

Licensed SLIM-Control 7.0 users
Note: To install this upgrade you must first be running SLIM Suite 7.0. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools70). For more information on specific fixes or enhancements included in this upgrade, see the Suite_70Changes.doc file in the SLIM-Control 7.0 Upgrade zip file.

GET PASSWORD

SLIM-Control 7.0 Upgrade (1.97 MB)

SControl_70.zip
  winzip iconGet Winzip

SLIM-Control 7.0 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Control 7.0 Users Manual (6.1 MB)in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SControl70 .zip
  winzip iconGet Winzip

SLIM-Control 7.0 API Documentation

 

Licensed Users Only
Note: The API download requires a different password - be sure to use the API password provided. Executing this zip file unzips the SLIM-SUITE 7.0 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-Control, consult the Readme.doc file.

GET PASSWORD

 

QSMAPI70.zip
  winzip iconGet Winzip

SLIM-Control 6.3b Upgrade

 

Licensed SLIM-Control 6.3 users
Note: To install this upgrade you must first be running SLIM Suite 6.3a or b. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools63). For more information on specific fixes or enhancements included in this upgrade, see the Suite_63bChanges.doc file in the SLIM-Control 6.3b Upgrade zip file (SCON63b.zip).

GET PASSWORD

SLIM-Control 6.3b Upgrade (1.74 MB)

SCON63b.zip

SLIM-Control 6.3 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Control 6.3 Users Manual (6.1 MB)in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SControl63 .zip

SLIM-Control 6.3 API Documentation

 

Licensed Users Only
Note: The API download requires a different password - be sure to use the API password provided. Executing this zip file unzips the SLIM-SUITE 6.3 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-Control, consult the Readme.doc file.

GET PASSWORD

 

QSMAPI63.zip

2005 Trend Line Updates

 

Licensed SLIM-Control 6.1 users
The 2005 Trend Line Update upgrades the trend line runtime files used by SLIM-Control 6.1. To install the trends, download and unzip the 05SCtrends.zip (491 KB) into the directory where SLIM-Control is installed. After updating, you will still have access to the 2002 trends. See the UpdatingSLIMTrends.doc file in the zip file for more information about the upgrade. information about the upgrade.

GET PASSWORD

 

05SCtrends.zip

SLIM-Control 6.1 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Control 6.1 Users Manual (6.47MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SLIM-Control_6.1 _User_Manual.zip



SLIM-MasterPlan Files

Back to top

   
  winzip iconGet Winzip

SLIM-MasterPlan 7.0 Upgrade

 

Licensed SLIM-MasterPlan 7.0 users
Note: To install this upgrade you must first be running SLIM Suite 7.0. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools70). For more information on specific fixes or enhancements included in this upgrade, see the Suite_70Changes.doc file in the SLIM-MasterPlan 7.0 Upgrade zip file.

GET PASSWORD

 

SMaster_70 .zip
  winzip iconGet Winzip

SLIM-MasterPlan 7.0 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-MasterPlan 7.0 Users Manual (1.52 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SMaster70 .zip

SLIM-MasterPlan 6.3 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-MasterPlan 6.3 Users Manual (1.52 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SMaster63 .zip
  winzip iconGet Winzip

SLIM-MasterPlan 6.3b Upgrade

 

Licensed SLIM-MasterPlan 6.3 users
Note: To install this upgrade you must first be running SLIM Suite 6.3a or b. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools63). For more information on specific fixes or enhancements included in this upgrade, see the Suite_63bChanges.doc file in the SLIM-MasterPlan 6.3b Upgrade zip file (SMAS63b.zip).

GET PASSWORD

SLIM-MasterPlan 6.3b Upgrade (811 KB)

SMAS63b.zip

SLIM-MasterPlan 6.3 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-MasterPlan 6.3 Users Manual (1.52 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SMaster63 .zip

SLIM-MasterPlan 6.1 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-MasterPlan 6.1 Users Manual (1.56 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SLIM-MasterPlan_ 6.1_Manual.zip



SLIM-Metrics Files

Back to top

   

SLIM-Metrics 7.0 Upgrade

 

Licensed SLIM-Metrics 7.0 users
Note: To install this upgrade you must first be running SLIM Suite 7.0. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools70). For more information on specific fixes or enhancements included in this upgrade, see the Suite_70Changes.doc file in the SLIM-Metrics 7.0 Upgrade zip file.

GET PASSWORD

 

SMetrics_70.zip

SLIM-Metrics 7.0 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Metrics 7.0 Users Manual (1.85 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SMetrics70.zip
  winzip iconGet Winzip

SLIM-Metrics 6.3b Upgrade

 

Licensed SLIM-Metrics 6.3 users
Note: To install this upgrade you must first be running SLIM Suite 6.3a or b. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools63). For more information on specific fixes or enhancements included in this upgrade, see the Suite_63bChanges.doc file in the SLIM-MasterPlan 6.3b Upgrade zip file (SMET63b.zip).

GET PASSWORD

SLIM-Metrics 6.3b Upgrade (895 KB)

SMET63b.zip

SLIM-Metrics 6.3 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Metrics 6.3 Users Manual (1.85 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SMetrics63.zip

2005 Trend Line Updates

 

Licensed SLIM-Metrics 6.1 users.
The 2005 Trend Line Update upgrades the trend line runtime files used by SLIM-Metrics 6.1. To install the trends, download and unzip the 05SMtrends.zip (911 KB) into the directory where SLIM-Metrics is installed. After updating, you will still have access to the 2002 trends. See the UpdatingSLIMTrends.doc file in the zip file for more information about the upgrade.

GET PASSWORD

 

05SMtrends.zip

SLIM-Metrics 6.1 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Metrics 6.1 Users Manual (2 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SLIM-Metrics _6.1.zip



SLIM-DataManager Files

Back to top

   
  winzip iconGet Winzip

SLIM-DataManager 7.0 Upgrade

 

Licensed SLIM-DataManager 7.0 users
Note: To install this upgrade you must first be running SLIM Suite 7.0. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools70). For more information on specific fixes or enhancements included in this upgrade, see the Suite_70Changes.doc file in the SLIM-DataManager 7.0 Upgrade zip file.

GET PASSWORD

 

SDataMgr_70 .zip
  winzip iconGet Winzip

SLIM-DataManager 7.0 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-DataManager 7.0 Users Manual (1.22 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SDataMgr70 .zip

SLIM-DataManager 7.0 API Documentation

 

Licensed Users Only
Note: The API download requires a different password - be sure to use the API password provided. Executing this zip file unzips the SLIM-SUITE 7.0 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager)will be downloaded. To see which documents and files apply to SLIM-DataManager, consult the Readme.doc file.

GET PASSWORD

 

QSMAPI70.zip
  winzip iconGet Winzip

SLIM-DataManager 6.3b Upgrade

 

Licensed SLIM-DataManager 6.3 users
Note: To install this upgrade you must first be running SLIM Suite 6.3a or b. If you are running an earlier version of SLIM Suite, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMTools63). For more information on specific fixes or enhancements included in this upgrade, see the Suite_63bChanges.doc file in the SLIM-MasterPlan 6.3b Upgrade zip file (SDAT63b.zip).

GET PASSWORD

SLIM-DataManager 6.3b Upgrade (932 KB)

SDAT63b.zip

SLIM-DataManager 6.3 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-DataManager 6.3 Users Manual (1.22 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SDataMgr63 .zip

SLIM-DataManager 6.3 API Documentation

 

Licensed Users Only
Note: The API download requires a different password - be sure to use the API password provided. Executing this zip file unzips the SLIM-SUITE 6.3 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager)will be downloaded. To see which documents and files apply to SLIM-DataManager, consult the Readme.doc file.

GET PASSWORD

 

QSMAPI63.zip

SLIM-DataManager 6.3 Data Dictionary

 

Licensed Users Only
Note: This download contains the SLIM-DataManager Data Dictionary in Adobe PDF format. It contains an overview of the database structure, table and field descriptions, and a table relationships diagram. The data dictionary is useful for creating custom queries, reports, or forms in Access and can also be used to interface between DataManager .smp files and other ODBC-compliant applications or file formats.

GET PASSWORD

Get Acrobat Reader

slim_63 datadict.zip

SLIM-DataManager 6.1 Users Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-DataManager 6.1 Users Manual (1.53 MB) in Adobe Acrobat .pdf format into a folder of your choosing.

GET PASSWORD

Get Acrobat Reader

SLIM-DataManager_ 6.1_Manual.zip

DataManager Data Collection Form

 

Contains a data collection form in Microsoft Excel format with field-by-field tips and online help screens. The data collecton form may be distributed to collect data from locations without access to SLIM-DataManager.

GET PASSWORD

Get Acrobat Reader

DataCollection-Frm.zip


Estimate Express Files

Back to top

   
  winzip iconGet Winzip

Estimate Express 6.0c Trend Line Upgrade

 

Licensed Estimate Express 6.0 users
Note: To install this upgrade you must have EstimateExpress 6.0 installed. If you are running an earlier version of Express, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder  (the default location is c:Program FilesQSMExpress60). This upgrade replaces the industry trends with the latest QSM reference information.  upgrade replaces the industry trends with the latest QSM reference information.

GET PASSWORD

EstimateExpress 6.0c Trend Line Upgrade

EExpress60C _run.zip

Estimate Express 6.0c Sample Files Upgrade

 

Licensed Estimate Express 6.0 users
Note: To install this upgrade you must have EstimateExpress 6.0 installed. If you are running an earlier version of Express, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to the Samples directory in your application folder  (the default location is c:Program FilesQSMExpress60Samples). This upgrade updates the sample files with the latest QSM template files.  upgrade updates the sample files with the latest QSM template files.

GET PASSWORD

EstimateExpress 6.0c Sample Files Upgrade

New_Sample _files.zip

Estimate Express 6.0c Training Files Upgrade

 

Licensed Estimate Express 6.0 users
Note: To install this upgrade you must have EstimateExpress 6.0 installed. If you are running an earlier version of Express, contact or your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to to the Training directory in your application folder (the default location is c:Program FilesQSMExpress60Training). This upgrade updates the training files with the latest available versions.  upgrade updates the training files with the latest available versions.

GET PASSWORD

EstimateExpress 6.0c Training Files Upgrade

Training_files.zip



Training Files

Back to top

   
  winzip iconGet Winzip

SLIM-Suite 6.3 Training Pack

 

Licensed Users Only
Contains the latest versions of the training files (15.5 MB) installed with SLIM-Suite 6.3.

GET PASSWORD

 

Training.exe
  winzip iconGet Winzip

Reload File

 

Licensed Users Only
Contains reload.bat, a DOS batch file referenced in the training course documentation.

GET PASSWORD

 

reload.bat



Miscellaneous Files

Back to top

   
  winzip iconGet Winzip

Data Collection Forms

 

Contains an assortment of data collection forms (446 KB) for use with SLIM-Estimate, SLIM-Control, and SLIM-Metrics.

  • SLIM-Estimate: Project Sizing and Estimation Data Form
  • SLIM-Estimate, SLIM-Control: Post Implementation Data Form
  • SLIM-Control: Data Requirements for Reconstructing Ongoing Projects
  • SLIM-Control: Project Traffic Light Analysis Data Form
  • SLIM-Metrics Data Collection Workbook
  • SLIM-Metrics Data Entry Spreadsheet

 

 

datafrms.zip

SLIM Suite API Executive Summary

 

Contains a high-level overview of the SLIM Suite API functionality.

 

 

SLIM_API_ Executive_ Summary .zip

SLIM-Suite Installation Manual

 

Licensed Users Only
Executing this zip file unzips the SLIM-Suite Installation Manual (1.53 MB) in Adobe Acrobat .pdf format into a folder of your choosing. in Adobe Acrobat .pdf format into a folder of your choosing.

 

Get Acrobat Reader

SLIM_6.1_Install _Manual.zip

DataManager Data Collection Form

 

Contains a data collection form in Microsoft Excel format with field-by- field tips and online help screens. The data collecton form may be distributed to collect data from locations without access to SLIM-DataManager.

 

 

DataCollection- Frm.zip

Code Counters

 

Please see the code counters page for an extensive list of code counters for various languages.

 

2006 QSM Users Conference Presentation Files part 1

 

Contains the Microsoft PowerPoint slides (6.9 MB) from presentations given on the first half of the 2006 QSM Users Conference held at the Tower Club in McLean, VA on September 28th.

  • "Effectively Managing Projects Throughout the Entire Motorola Development Lifecycle”, Gaylord Yu (Motorola) "
  • "Transition to Metrics Driven Management” Duane Randall, (Misys)
  • “Agile Productivity Metrics” Mike Mah (QSM Associates)
  • "Introducting QSM Europe" Peter van der Stad (QSM Europe)
 

 

Day1_part1.zip

2006 QSM Users Conference Presentation Files part 2

 

Contains the Microsoft PowerPoint slides (7.8 MB) from presentations given on the second half of the 2006 QSM Users Conference held at the Tower Club in McLean, VA on September 28th.

  • “Using SLIM to Objectively Compare COTS, New Development, and Enhancement alternatives” Joe Madden (BearingPoint)
  • “Agile Management Software Release Increments,”, "Offshore Benchmark" Jim Greene, QSM Europe
  • "QSM Tool Time: A discussion and demonstration of what is currently under development and a opportunity to tell QSM what capabilities you would like to see in the future." - Lauren Thayer, Doug Putnam, Dennis Palazzo
  • "It Takes a Village To Build a World Class Software Metrics Database" Kate Armel (QSM)
  • "Initial Research Circa 1975" Larry Putnam, Senior (QSM)
 

 

Day1_part2.zip