- Online Demo
- RSS
- Contact Us
- 800.424.6755
- Home
- Tools
- Consulting
- Consulting Overview
- High Performance Benchmark Service
- Estimation Process Consulting Service
- SLIM Product Configuration and Deployment Services
- Acquisition and Program Management
- Independent Bid Assessment / Alternatives Analysis
- Independent Verification and Validation (IV&V)
- Project Health Check & Forecasting Service
- SLIM API Programming
- QSM Historical Database
- Training
- Resources
- Support
- About Us
- Contact Us
Downloads
SLIM-Estimate®
LEARN ABOUT OUR PROJECT MANAGEMENT SOLUTIONS FOR SOFTWARE DEVELOPMENT
SLIM-Estimate 8.0 Installation/Upgrade Files | |
Installation/upgrade files and instructions for the latest release of SLIM-Suite User guides, sample files, templates and training materials are now installed during setup. For more information (and frequently asked installation questions), visit our Installation FAQs page. | |
SLIM-Estimate 7.0e1 Upgrade | |
| Licensed SLIM-Estimate 7.0c users Note: To install this upgrade you must first be running SLIM Suite 7.0, version c or later. If you are running an earlier version of SLIM Suite, you can download the 7.0c upgrade below or contact QSM for further instructions. To upgrade your 7,0c installation, download and unzip the Upgrade file to your application folder (the default location is c:\Program Files\QSM\Tools70). NOTE: One of the fixes in this upgrade requires the installation of new DLLs. If you do not use SLIM-MasterPlan, you can download the upgrade from this page. SLIM-MasterPlan users should upgrade with the installable version of 7.0e1 as opposed to the downloadable version. |
|
| SLIM-Estimate 7.0e1 upgrade | |
SLIM-Estimate 7.0c4 Upgrade | |
| Licensed SLIM-Estimate 7.0 users Note: To install this upgrade you must first be running SLIM Suite 7.0. If you are running an earlier version of SLIM Suite, contact your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder (the default location is c:\Program Files\QSM\Tools70). NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-Estimate. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. |
|
| SLIM-Estimate 7.0c4 upgrade | |
SLIM-Estimate 7.0c3 Upgrade | |
Licensed SLIM-Estimate 7.0 users NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-Estimate. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. |
|
| SLIM-Estimate 7.0c upgrade | |
Workstation Install | |
Licensed SLIM-Estimate 7.0 users To upgrade your installation, download and unzip the Upgrade file to the Workstation setup folder on the server. You will find this folder inside the Tools70 folder on the server (the default location is <network drive letter>\Program Files\QSM\Tools70). This update fixes an installation issue some users were experiencing when running the Workstation setup. You need only download and install one instance of this upgrade - for convenience, a copy of the upgrade appears under each tool section of the Downloads page (e.g., SLIM-Estimate, SLIM-Control, etc.) | GET PASSWORD |
| Workstation install upgrade | |
SLIM-Estimate 7.0 Samples & Templates | |
Licensed SLIM-Estimate 7.0 users Instructions for the 7.0c downloads are available here. If you would prefer to have QSM ship you an installable upgrade CD, please contact Kate Armel at 301 865-8242 or email support@qsm.com. | GET PASSWORD |
| SLIM-Estimate IT templates | |
| SLIM-Estimate Engineering templates | |
| Sample Files (all products) | |
SLIM-Estimate 7.0 Users Manual | |
Licensed Users Only | GET PASSWORD |
| SEstimat70 .zip | |
SLIM-Estimate 8.0 API Documentation | |
| Licensed Users Only. NOTE: The API download requires a different password - be sure to use the API password provided. SLIM-SUITE 8.0 Application Programmers Interface Documentation (6.7 MB) Download and unzip to a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-Estimate, consult the Readme.doc file. |
|
| 8.0 API Documentation | |
SLIM-Estimate 7.0 API Documentation | |
Licensed Users Only SLIM-SUITE 7.0 Application Programmers Interface Documentation (6.7 MB) Download and unzip to a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-Estimate, consult the Readme.doc file.
| GET PASSWORD |
| 7.0 API Documentation | |
SLIM-Estimate 6.3 API Documentation | |
Licensed Users Only
| GET PASSWORD |
| 6.3 API Documentation | |
SLIM-Control®
SLIM-Control 8.0 Installation/Upgrade Files | |
Installation/upgrade files and instructions for the latest release of SLIM-Suite User guides, sample files, templates and training materials are now installed during setup. For more information (and frequently asked installation questions), visit our Installation FAQs page. | |
SLIM-Control 7.0e1 Upgrade | |
| Licensed SLIM-Control7.0c users Note: To install this upgrade you must first be running SLIM Suite 7.0, version c or later. If you are running an earlier version of SLIM Suite, you can download the 7.0c upgrade below or contact your software administrator for further instructions. To upgrade your 7,0c installation, download and unzip the Upgrade file to your application folder (the default location is c:\Program Files\QSM\Tools70). NOTE: The MasterPlan fixes in this upgrade require the installation of new DLLs. If you do not use SLIM-MasterPlan, the downloadable upgrade is sufficient. SLIM-MasterPlan users should upgrade with the installable version of 7.0e1 as opposed to the downloadable version. | GET PASSWORD |
| SLIM-Control 7.0e1 Upgrade | |
SLIM-Control 7.0c4 Upgrade | |
Licensed SLIM-Control 7.0 users NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-Control. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. | GET PASSWORD |
| SLIM-Control 7.0c4 Upgrade | |
SLIM-Control 7.0c3 Upgrade | |
Licensed SLIM-Control 7.0 users NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-Control. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. | GET PASSWORD |
SLIM-Control 7.0c3 Upgrade (1.97 MB) | SC70c3_082409.zip |
Workstation Install | |
Licensed SLIM-Control 7.0 users | GET PASSWORD |
| Workstation install upgrade | |
SLIM-Control 7.0 Samples & Templates | |
Licensed SLIM-Estimate 7.0 users | GET PASSWORD |
| Control Templates | |
| Sample Files (all products) | |
SLIM-Control 7.0 Users Manual | |
Licensed Users Only | GET PASSWORD |
| SLIM-Control 7.0 Users Manual | |
SLIM-Control 8.0 API Documentation | |
Licensed Users Only Executing this zip file unzips the SLIM-SUITE 8.0 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-Control, consult the Readme.doc file.
| GET PASSWORD |
| 8.0 API Documentation | |
| |
SLIM-Control 7.0 API Documentation | |
Licensed Users Only Executing this zip file unzips the SLIM-SUITE 7.0 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-Control, consult the Readme.doc file. |
|
SLIM-Control 6.3 API Documentation | |
Licensed Users Only Executing this zip file unzips the SLIM-SUITE 6.3 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-Control, consult the Readme.doc file.
| GET PASSWORD |
| 6.3 API Documentation |
SLIM-MasterPlan®
SLIM-MasterPlan 8.0 Upgrade/Installation Files | |
Installation/upgrade files and instructions for the latest release of SLIM-Suite User guides, sample files, templates and training materials are now installed during setup. For more information (and frequently asked installation questions), visit our Installation FAQs page. | |
SLIM-MasterPlan 7.0e1 Upgrade | |
| The MasterPlan fixes in this upgrade require the installation of new DLLs. SLIM-MasterPlan users should upgrade with the installable version of 7.0e1 as opposed to the downloadable version. Please contact your software administrator or your QSM Account Manager to obtain an installable CD. | |
SLIM-MasterPlan 7.0c4 Upgrade | |
Licensed SLIM-MasterPlan 7.0 users NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-MasterPlan. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. | GET PASSWORD |
| MasterPlan 7.0c4 Upgrade | |
SLIM-MasterPlan 7.0c3 Upgrade | |
Licensed SLIM-MasterPlan 7.0 users NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-MasterPlan. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. | GET PASSWORD |
| MasterPlan 7.0c3 Upgrade | |
Workstation Install | |
Licensed SLIM-MasterPlan 7.0 users
| GET PASSWORD |
| Workstation install upgrade | |
SLIM-MasterPlan 7.0 Samples & Templates | |
Licensed SLIM-Estimate 7.0 users | GET PASSWORD |
| SLIM-MasterPlan samples only | |
| Sample files (all products) | |
SLIM-MasterPlan 7.0 Users Manual | |
Licensed Users Only | GET PASSWORD |
| MasterPlan 7.0 Manual |
SLIM-Metrics®
SLIM-Metrics 8.0 Upgrade/Installation Files | |
Installation/upgrade files and instructions for the latest release of SLIM-Suite User guides, sample files, templates and training materials are now installed during setup. For more information (and frequently asked installation questions), visit our Installation FAQs page. | |
SLIM-Metrics 7.0e1 Upgrade | |
| Licensed SLIM-Metrics 7.0c users Note: To install this upgrade you must first be running SLIM Suite 7.0, version c or later. If you are running an earlier version of SLIM Suite, you can download the 7.0c upgrade below or contact your software administrator for further instructions. To upgrade your 7.0c installation, download and unzip the Upgrade file to your application folder (the default location is c:\Program Files\QSM\Tools70). NOTE: The MasterPlan fixes in this upgrade require the installation of new DLLs. If you do not use SLIM-MasterPlan, the downloadable upgrade is sufficient. SLIM-MasterPlan users should upgrade with the installable version of 7.0e1 as opposed to the downloadable version. | GET PASSWORD |
| SLIM-Metrics 7.0e1 Upgrade | |
SLIM-Metrics 7.0c4 Upgrade | |
Licensed SLIM-Metrics 7.0 users NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-Metrics. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. | GET PASSWORD |
| SLIM-Metrics 7.0c4 Upgrade | |
SLIM-Metrics 7.0c3 Upgrade | |
Licensed SLIM-Metrics 7.0 users NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-Metrics. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. | GET PASSWORD |
| SLIM-Metrics 7.0c3 Upgrade | |
Workstation Install | |
Licensed SLIM-Metrics 7.0 users | GET PASSWORD |
| Workstation Install | |
SLIM-Metrics 7.0 Samples & Templates | |
Licensed SLIM-Metrics 7.0 users | GET PASSWORD |
| SLIM-Metrics samples only | |
| SLIM-Metrics trend creation template | |
| Sample files (all products) | |
SLIM-Metrics 7.0 Users Manual | |
Licensed Users Only | GET PASSWORD |
| SLIM-Metrics 7.0 Manual | |
SLIM-DataManager®
SLIM-DataManager 8.0 Upgrade/Installation Files | |
Installation/upgrade files and instructions for the latest release of SLIM-Suite User guides, sample files, templates and training materials are now installed during setup. For more information (and frequently asked installation questions), visit our Installation FAQs page. | |
SLIM-DataManager 7.0e1 Upgrade | |
| Licensed SLIM-DataManager 7.0c users Note: To install this upgrade you must first be running SLIM Suite 7.0, version c or later. If you are running an earlier version of SLIM Suite, you can download the 7.0c upgrade below or contact your software administrator for further instructions. To upgrade your 7.0c installation, download and unzip the Upgrade file to your application folder (the default location is c:\Program Files\QSM\Tools70). NOTE: The MasterPlan fixes in this upgrade require the installation of new DLLs. If you do not use SLIM-MasterPlan, the downloadable upgrade is sufficient. SLIM-MasterPlan users should upgrade with the installable version of 7.0e1 as opposed to the downloadable version. | GET PASSWORD |
| DataManager 7.0e1 Upgrade | |
SLIM-DataManager 7.0c4 Upgrade | |
Licensed SLIM-DataManager 7.0 users NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-DataManager. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. | GET PASSWORD |
| DataManager 7.0c4 Upgrade | |
SLIM-DataManager 7.0c3 Upgrade | |
Licensed SLIM-DataManager 7.0 users NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-DataManager. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. | GET PASSWORD |
| DM 70c3 Upgrade | |
SLIM-DataManager 7.0 Samples & Templates | |
Licensed SLIM-DataManager 7.0 users | GET PASSWORD |
| SLIM-DataManager samples only | |
| Sample files (all products) | |
| |
SLIM-DataManager 7.0 Users Manual | |
Licensed Users Only | GET PASSWORD |
| DM 70 Users Manual | |
SLIM-DataManager 8.0 API Documentation | |
Licensed Users Only Executing this zip file unzips the SLIM-SUITE 8.0 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-DataManager, consult the Readme.doc file. |
|
SLIM-DataManager 7.0 API Documentation | |
Licensed Users Only Executing this zip file unzips the SLIM-SUITE 7.0 Application Programmers Interface Documentation (6.7 MB) format into a folder of your choosing. Documentation for the Entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded. To see which documents and files apply to SLIM-DataManager, consult the Readme.doc file. | GET PASSWORD |
| 70 API Documents | |
| |
SLIM-DataManager 6.3 API Documentation | |
Licensed Users Only | GET PASSWORD |
| 63 API Documents | |
| |
SLIM-DataManager 6.3 Data Dictionary | |
Licensed Users Only | GET PASSWORD |
| 63 Data Dictionary | |
DataManager Data Collection Form | |
Contains a data collection form in Microsoft Excel format with field-by-field tips and online help screens. The data collection form may be distributed to collect data from locations without access to SLIM-DataManager. | GET PASSWORD |
| Data Collection Form |
Estimate Express®
Estimate Express 6.0c Trend Line Upgrade | |
Licensed Estimate Express 6.0 users | GET PASSWORD |
Estimate Express 6.0c Sample Files Upgrade | |
Licensed Estimate Express 6.0 users | GET PASSWORD |
| EE 6.0c Sample Files Upgrade | |
Estimate Express 6.0c Training Files Upgrade | |
Licensed Estimate Express 6.0 users | GET PASSWORD |
| EE Training Files |
Training Files
Miscellaneous Files
Data Collection Forms | |
Contains an assortment of data collection forms (446 KB) for use with SLIM-Estimate, SLIM-Control, and SLIM-Metrics.
| |
| datafrms.zip |
SLIM Suite API Executive Summary | |
Contains a high-level overview of the SLIM Suite API functionality. | |
| SLIM_API_ Executive_ Summary.zip |
SLIM-Suite Installation Manual | |
Licensed Users Only | |
| SLIM_6.1_Install _Manual.zip | |
DataManager Data Collection Form | |
Contains a data collection form in Microsoft Excel format with field-by- field tips and online help screens. The data collection form may be distributed to collect data from locations without access to SLIM-DataManager. | |
| DataCollection- Frm.zip |
Code Counters | |
Please see the code counters page for an extensive list of code counters for various languages. | |
2006 QSM Users Conference Presentation Files part 1 | |
Contains the Microsoft PowerPoint slides (6.9 MB) from presentations given on the first half of the 2006 QSM Users Conference held at the Tower Club in McLean, VA on September 28th.
| |
| Day1_part1.zip |
2006 QSM Users Conference Presentation Files part 2 | |
Contains the Microsoft PowerPoint slides (7.8 MB) from presentations given on the second half of the 2006 QSM Users Conference held at the Tower Club in McLean, VA on September 28th.
| |
| Day1_part2.zip |