QSM provides unparalleled support throughout the product acquisition, installation, and implementation process.
For nearly five decades, QSM has helped organizations bring data-driven discipline to software project estimation, tracking, and benchmarking. Our methodology and tools turn project complexity into measurable, defensible outcomes.
On Thursday, Oct. 6 at 1:00 PM EDT, QSM will host a webinar focused on the relationship and apparent paradox between software size, productivity, and reliability.
Now, more than ever, software projects need to efficiently deliver reliable software. However, many development plans unintentionally guarantee a less than optimal result. This presentation describes how to maximize value by establishing minimum acceptable reliability and how to take advantage of the apparent paradox between software size and productivity through appropriate selection of team size and schedule duration.
Paul Below has over 25 years' experience in measurement technology, statistical analysis, estimating, forecasting, Lean Six Sigma, and data mining. He serves as a consultant for QSM, providing clients with statistical analysis of operational performance for process improvement and predictability. Mr. Below is a Certified Software Quality Analyst, a past Certified Function Point Specialist, and a Six Sigma Black Belt. He has been a course developer and instructor for Estimating, Lean Six Sigma, Metrics Analysis, Function Point Analysis, as well as statistical analysis in the Masters of Software Engineering program at Seattle University. He has one US patent and two patents pending.
View the replay of this webinar.