QSM provides unparalleled support throughout the product acquisition, installation, and implementation process.
For nearly five decades, QSM has helped organizations bring data-driven discipline to software project estimation, tracking, and benchmarking. Our methodology and tools turn project complexity into measurable, defensible outcomes.
The SLIM‐Suite API is a package of programming support tools that enable customer‐developed applications to interface with the QSM tool suite. You can use the SLIM‐Suite API to seamlessly move data between applications and leverage the power of the SLIM calculating engine.
SLIM‐Estimate API, SLIM‐Control API, and SLIM‐DataManager API type libraries are installed with SLIM-Suite.
Each version-specific package contains documentation, API demo spreadsheets, and supporting workbooks for all three SLIM-Suite API demos (Estimate, Control, and DataManager). Please download the package that matches the version of SLIM-Suite you are currently running.
v10.3 or v10.4 API Demo Package
v10.2 API Demo Package
Licensed Users Only. API passwords are available via the REQUEST PASSWORD link.