Skip to main content

SLIM-Suite for Software Lifecycle Management

SLIM gives you the power to estimate, track, forecast, and benchmark software projects from concept to closeout.

Predictable software project operations

QSM's Software Lifecycle Management (SLIM) products are the industry standard and the top choice for more than four decades for Fortune 1000 corporations and governments worldwide. Drawing from a database of over 14,500 verified software projects (the largest database of its kind), our machine-learning software model and predictive analytics enable better decision making at every stage of the project development lifecycle–estimating, tracking, and metrics analysis. Each application is designed to deliver powerful results, either as a standalone application or as part of QSM's integrated suite.

SLIM-Suite — Integrated Products for Strategic Software Management

All software projects exhibit the elements of lifecycle behavior. If this behavior is not known to managers a priori, then they will respond reactively (non-optimally with time lags) to system demands. Adding to the difficulty is the ever-present problem of imprecise and continually changing requirements and specifications.

The software estimation practice is not a single event in time. It is a continuous process that evolves as the design matures and the requirements evolve.  There are three areas of focus.  If you do these well, you will be successful:

  • First: Learn from the past and improve over time.  Look for repeating patterns in your project data.  Determine the cause and effect relationships.  Address the areas for improvement while leveraging the strengths.
  • Second: Establish expectations from a proven capability.  That means that you determine what is feasible early on, then make realistic commitments and provide a reasonable risk-return relationship.
  • Third: Start in control and stay in control.  Have a defensible plan, track against it, and adjust as necessary.  Always negotiate corrections when circumstances dictate to reduce risk and surprises.

This is a closed-loop process that never ends. 
Explore how each product fits in the SLIM Ecosystem.
 

SLIM-Suite

An integrated platform for software estimation, tracking, and benchmarking — from concept to closeout.

→
SLIM-Estimate
Top-down scope-based software project estimation
→
SLIM-Control
Software project tracking and predictive forecasting
→
SLIM-DataManager
Completed software project core and custom metric data
→
SLIM-Metrics
Software productivity and performance analytics
→
SLIM-MasterPlan
Large software program/portfolio estimates and risk assessment
→
SLIM-Collaborate
Enterprise software estimation and completed project analytics

SLIM-Suite Benefits

Predictive modeling throughout

SLIM machine learning algorithms are used in all products, adapting to the most recent data

Seamless data sharing

Easily import and export software project metrics data between SLIM products

Projects, programs, and portfolios

Estimate stand-alone software projects, complex programs, and enterprise portfolios

Data-driven decisions at every stage

Fundamental software project data analytics and risk assessments with customizable dashboards

Request a Demo

Register for a live demo of SLIM to see how data-driven software estimation and analytics can improve the way your organization plans and delivers software projects. During the session, you’ll see how SLIM uses proven models and industry benchmark data to help teams produce more accurate estimates, manage in-flight projects, and conduct post-project analysis.