Downloads
SLIM-Estimate ®
LEARN ABOUT OUR PROJECT MANAGEMENT SOLUTIONS FOR SOFTWARE DEVELOPMENT
Instructions for the 7.0c downloads are available here. If you would prefer to have QSM ship you an installable upgrade CD, please contact Kate Armel at 301 865-8242 or email support@qsm.com.
| SLIM-Estimate 7.0c4 Upgrade | |
|
Licensed SLIM-Estimate 7.0 users
Note: To install this upgrade you must first be running SLIM Suite 7.0. If you are running an earlier version of SLIM Suite, contact your software administrator for further instructions. To upgrade your installation, download and unzip the Upgrade file to your application folder (the default location is c:\Program Files\QSM\Tools70). NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-Estimate. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. |
GET PASSWORD |
|
|
SE70c4_092509.zip |
|
|
|
|
SLIM-Estimate 7.0c3 Upgrade |
|
|
Licensed SLIM-Estimate 7.0 users
NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-Estimate. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. |
GET PASSWORD |
|
SLIM-Estimate 7.0c3 Upgrade (1.97 MB) |
SE70c3_082409.zip |
|
|
|
|
Workstation Install |
|
|
Licensed SLIM-Estimate 7.0 users
|
GET PASSWORD |
|
Workstation install upgrade |
Workstation_70.zip |
|
|
|
|
SLIM-Estimate 7.0 Samples & Templates |
|
|
Licensed SLIM-Estimate 7.0 users
|
GET PASSWORD |
|
SLIM-Estimate IT templates |
Est_IT_templ.zip |
|
SLIM-Estimate Engineering templates |
Eng_outl_templ.zip |
|
Sample files (all products) |
Samples_70.zip |
|
|
|
SLIM-Estimate 7.0 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SEstimat70 .zip | |
|
|
|
SLIM-Estimate 7.0 API Documentation |
|
|
Licensed Users Only
|
GET PASSWORD |
|
|
QSMAPI70.zip |
|
|
|
SLIM-Estimate 6.3c Upgrade |
|
|
Licensed SLIM-Estimate 6.3 users
|
GET PASSWORD |
|
SLIM-Estimate 6.3c Upgrade (1.97 MB) |
SE63110507.zip |
SLIM-Estimate 6.3 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SEstimat63 .zip | |
SLIM-Estimate 6.3 API Documentation |
|
|
Licensed Users Only
|
GET PASSWORD |
|
|
QSMAPI63.zip |
SLIM-Control
®
SLIM-Control 7.0c4 Upgrade |
|
|
Licensed SLIM-Control 7.0 users
NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-Control. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. |
GET PASSWORD |
| SC70c4_092509.zip | |
|
|
|
SLIM-Control 7.0c3 Upgrade |
|
|
Licensed SLIM-Control 7.0 users
NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-Control. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. |
GET PASSWORD |
|
SLIM-Control 7.0c3 Upgrade (1.97 MB) |
SC70c3_082409.zip |
|
|
|
|
Workstation Install |
|
|
Licensed SLIM-Control 7.0 users
|
GET PASSWORD |
|
Workstation install upgrade |
Workstation_70.zip |
|
|
|
|
SLIM-Control 7.0 Samples & Templates |
|
|
Licensed SLIM-Estimate 7.0 users
|
GET PASSWORD |
|
SLIM-Control templates |
Control_templ.zip |
|
Sample files (all products) |
Samples_70.zip |
|
|
|
SLIM-Control 7.0 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SControl70 .zip | |
|
|
|
SLIM-Control 7.0 API Documentation |
|
|
Licensed Users Only
|
GET PASSWORD |
|
|
QSMAPI70.zip |
|
|
|
SLIM-Control 6.3c Upgrade |
|
|
Licensed SLIM-Control 6.3 users
|
GET PASSWORD |
|
SLIM-Control 6.3c Upgrade (1.74 MB) |
SC63110507.zip |
SLIM-Control 6.3 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SControl63.zip | |
SLIM-Control 6.3 API Documentation |
|
|
Licensed Users Only
|
GET PASSWORD |
|
|
QSMAPI63.zip |
SLIM-MasterPlan
®
SLIM-MasterPlan 7.0c4 Upgrade |
|
|
Licensed SLIM-MasterPlan 7.0 users
NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-MasterPlan. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. |
GET PASSWORD |
| MP70c4_092509.zip | |
|
|
|
SLIM-MasterPlan 7.0c3 Upgrade |
|
|
Licensed SLIM-MasterPlan 7.0 users
NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-MasterPlan. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. |
GET PASSWORD |
|
|
MP70c3_082409.zip |
|
|
|
|
Workstation Install |
|
|
Licensed SLIM-MasterPlan 7.0 users
|
GET PASSWORD |
|
Workstation install upgrade |
Workstation_70.zip |
|
|
|
|
SLIM-MasterPlan 7.0 Samples & Templates |
|
|
Licensed SLIM-Estimate 7.0 users
|
GET PASSWORD |
|
SLIM-MasterPlan samples only |
MPlan_samp.zip |
|
Sample files (all products) |
Samples_70.zip |
|
|
|
SLIM-MasterPlan 7.0 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SMaster70 .zip | |
SLIM-MasterPlan 6.3 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SMaster63 .zip | |
|
|
|
SLIM-MasterPlan 6.3c Upgrade |
|
|
Licensed SLIM-MasterPlan 6.3 users
|
GET PASSWORD |
|
SLIM-MasterPlan 6.3c Upgrade (811 KB) |
MP63110507.zip |
SLIM-MasterPlan 6.3 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SMaster63 .zip |
SLIM-Metrics
®
SLIM-Metrics 7.0c4 Upgrade |
|
|
Licensed SLIM-Metrics 7.0 users
NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-Metrics. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. |
GET PASSWORD |
| SM70c4_092509.zip | |
SLIM-Metrics 7.0c3 Upgrade |
|
|
Licensed SLIM-Metrics 7.0 users
NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-Metrics. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. |
GET PASSWORD |
|
|
SM70c3_082409.zip |
|
Workstation Install |
|
|
Licensed SLIM-Metrics 7.0 users
|
GET PASSWORD |
|
Workstation install upgrade |
Workstation_70.zip |
|
|
|
|
SLIM-Metrics 7.0 Samples & Templates |
|
|
Licensed SLIM-Metrics 7.0 users
|
GET PASSWORD |
|
SLIM-Metrics samples only |
Metrics_samp.zip |
| SLIM-Metrics trend creation template | Metr_template.zip |
|
Sample files (all products) |
Samples_70.zip |
|
|
|
SLIM-Metrics 7.0 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SMetrics70.zip | |
|
|
|
SLIM-Metrics 6.3c Upgrade |
|
|
Licensed SLIM-Metrics 6.3 users
|
GET PASSWORD |
|
SLIM-Metrics 6.3c Upgrade (895 KB) |
SM63110507.zip |
SLIM-Metrics 6.3 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SMetrics63.zip | |
|
Licensed SLIM-Metrics 6.1 users.
|
GET PASSWORD |
|
|
05SMtrends.zip |
SLIM-DataManager
®
SLIM-DataManager 7.0c4 Upgrade |
|
|
Licensed SLIM-DataManager 7.0 users
NOTE: If you installed the 7.0c3 upgrade below prior to 092809, install this patch to update to the latest version of SLIM-DataManager. If you have not installed the 7.0c3 patch, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. DOWNLOAD ONLY THE 7.0c3 UPGRADE. It has been updated to include this patch. |
GET PASSWORD |
| DM70c4_092509.zip | |
|
|
|
SLIM-DataManager 7.0c3 Upgrade |
|
|
Licensed SLIM-DataManager 7.0 users
NOTE: If you installed this upgrade prior to 092809, download and install the 7.0c4 upgrade above to upgrade to the latest version of SLIM-DataManager. If you have not installed this 7.0c3 upgrade yet, you do NOT need to install both the 7.0c4 and 7.0c3 downloads. The 7.0c3 download has been updated to include the 7.0c4 patch. |
GET PASSWORD |
|
|
DM70c3_082409.zip |
|
|
|
|
SLIM-DataManager 7.0 Samples & Templates |
|
|
Licensed SLIM-DataManager 7.0 users
|
GET PASSWORD |
|
SLIM-DataManager samples only |
DataMgr_samp.zip |
|
Sample files (all products) |
Samples_70.zip |
|
|
|
SLIM-DataManager 7.0 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SDataMgr70 .zip | |
SLIM-DataManager 7.0 API Documentation |
|
|
Licensed Users Only
|
GET PASSWORD |
|
|
QSMAPI70.zip |
|
|
|
SLIM-DataManager 6.3c Upgrade |
|
|
Licensed SLIM-DataManager 6.3 users
|
GET PASSWORD |
|
SLIM-DataManager 6.3c Upgrade (932 KB) |
DM63110507.zip |
SLIM-DataManager 6.3 Users Manual |
|
|
Licensed Users Only
|
GET PASSWORD |
| SDataMgr63 .zip | |
SLIM-DataManager 6.3 API Documentation |
|
|
Licensed Users Only
|
GET PASSWORD |
|
|
QSMAPI63.zip |
SLIM-DataManager 6.3 Data Dictionary |
|
|
Licensed Users Only
|
GET PASSWORD |
| slim_63 datadict.zip | |
DataManager Data Collection Form |
|
|
Contains a data collection form in Microsoft Excel format with field-by-field tips and online help screens. The data collection form may be distributed to collect data from locations without access to SLIM-DataManager. |
GET PASSWORD |
| DataCollection-Frm.zip |
Estimate Express ®
|
|
|
Estimate Express 6.0c Trend Line Upgrade |
|
|
Licensed Estimate Express 6.0 users
|
GET PASSWORD |
|
EstimateExpress 6.0c Trend Line Upgrade |
EExpress60C _run.zip |
Estimate Express 6.0c Sample Files Upgrade |
|
|
Licensed Estimate Express 6.0 users
|
GET PASSWORD |
|
EstimateExpress 6.0c Sample Files Upgrade |
New_Sample _files.zip |
Estimate Express 6.0c Training Files Upgrade |
|
|
Licensed Estimate Express 6.0 users
|
GET PASSWORD |
|
EstimateExpress 6.0c Training Files Upgrade |
Training_files.zip |
Training Files
|
|
|
SLIM-Suite 6.3 Training Pack |
|
|
Licensed Users Only
|
GET PASSWORD |
|
|
Training.exe |
|
|
|
Reload File |
|
|
Licensed Users Only
|
GET PASSWORD |
|
|
reload.bat |
Miscellaneous Files
|
|
|
Data Collection Forms |
|
|
Contains an assortment of data collection forms (446 KB) for use with SLIM-Estimate, SLIM-Control, and SLIM-Metrics.
|
|
|
|
datafrms.zip |
SLIM Suite API Executive Summary |
|
|
Contains a high-level overview of the SLIM Suite API functionality. |
|
|
|
SLIM_API_ Executive_ Summary.zip |
SLIM-Suite Installation Manual |
|
|
Licensed Users Only
|
|
| SLIM_6.1_Install _Manual.zip | |
DataManager Data Collection Form |
|
|
Contains a data collection form in Microsoft Excel format with field-by- field tips and online help screens. The data collection form may be distributed to collect data from locations without access to SLIM-DataManager. |
|
|
|
DataCollection- Frm.zip |
Code Counters |
|
|
Please see the code counters page for an extensive list of code counters for various languages. |
|
2006 QSM Users Conference Presentation Files part 1 |
|
|
Contains the Microsoft PowerPoint slides (6.9 MB) from presentations given on the first half of the 2006 QSM Users Conference held at the Tower Club in McLean, VA on September 28th.
|
|
|
|
Day1_part1.zip |
2006 QSM Users Conference Presentation Files part 2 |
|
|
Contains the Microsoft PowerPoint slides (7.8 MB) from presentations given on the second half of the 2006 QSM Users Conference held at the Tower Club in McLean, VA on September 28th.
|
|
|
|
Day1_part2.zip |