Downloads

 

 

Install or Upgrade SLIM-Suite Versions 8.0® or 8.1®

LEARN ABOUT OUR PROJECT MANAGEMENT SOLUTIONS FOR SOFTWARE DEVELOPMENT

  

SLIM-Suite 8.0 and 8.1 Installation/Upgrade Files


 

Visit our Installation & Upgrades page to download setup files, release notes, installation manuals and instructions for installing or upgrading to SLIM-Suite 8.0 or 8.1. For more information and a list of frequently asked installation questions, visit our Installation FAQs page.

 


SLIM-Suite 8.0 API Documentation

 
Licensed Users Only. API passwords available via the GET PASSWORD link.

SLIM-SUITE 8.0 Application Programmers Interface Documentation
(6.7 MB) Download and unzip to a folder of your choosing. Documentation, API demo spreadsheets, and supporting filesDownload and unzip to a folder of your choosing. Documentation, API demo spreadsheets, and supporting files for the entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded.

GET PASSWORD

 


 8.0 API Documentation
  

SLIM-Suite 7.0 API Documentation

 

Licensed Users Only. API passwords available via the GET PASSWORD link.
 

SLIM-SUITE 7.0 Application Programmers Interface Documentation (6.7 MB) Download and unzip to a folder of your choosing. Documentation, API demo spreadsheets, and supporting filesDownload and unzip to a folder of your choosing. Documentation, API demo spreadsheets, and supporting files for the entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded.

 

GET PASSWORD
7.0 API Documentation
   

SLIM-Suite 6.3 API Documentation

 

Licensed Users Only. API passwords available via the GET PASSWORD link.
SLIM-SUITE 6.3 Application Programmers Interface Documentation. Download and unzip to a folder of your choosing. Documentation, API demo spreadsheets, and supporting filesDownload and unzip to a folder of your choosing. Documentation, API demo spreadsheets, and supporting files for the entire SLIM Suite API (Estimate, Control, and DataManager) will be downloaded.

 

GET PASSWORD
6.3 API Documentation
 

 


SLIM-Control®

Back to top


SLIM-MasterPlan®

Back to top


SLIM-Metrics®

Back to top

SLIM-DataManager®

Back to top


Training Files

Back to top

 

  

SLIM-Suite 8.0 Training Files

GET PASSWORD
Licensed SLIM-Suite 8.0 users
Who should upgrade: Trainees who attended SLIM-Suite training on or after April of 2012 or any SLIM-Suite user who wants to upgrade SLIM-Suite 8.0 to the newest training exercises.

This downloadable zip file contains the SLIM-Suite training files used in our McLean, VA training class. To update currently installed training files with the latest available versions, download and extract SLIM-Suite Training files to the Training directory located in your application folder (the default location is c:\Program Files(x86)\QSM\Tools80\Training). 
SLIM-Suite 
Training Files
    


Miscellaneous Files

Back to top