QSM Downloads

QSM Downloads

Install or Upgrade SLIM-Suite Versions 8.1, 8.2 or 9.0

SLIM-Suite 8.1, 8.2, and 9.0 Installation/Upgrade Files

Visit our Installation & Upgrades page to download setup files, release notes, installation manuals and instructions for installing or upgrading to SLIM-Suite 8.1, 8.2, or 9.0. For more information and a list of frequently asked installation questions, visit our Installation FAQs page.

 

SLIM-Suite APIs

SLIM-SUITE API (Application Programmers Interface) Packages

Download and unzip selected version to a folder of your choosing. Documentation, API demo spreadsheets, and supporting workbooks for all three SLIM Suite API demos (Estimate, Control, and DataManager) will be downloaded. Please note that these API demos are version specific - be sure to download the package that corresponds to the version of SLIM-Suite (e.g., 9.0, 8.2, or 8.1) you are currently running.

Licensed Users Only. API passwords available via the REQUEST PASSWORD link.
SLIM-Suite 9.0 API Demo Package
SLIM-Suite 8.2 API Demo Package
SLIM-Suite 8.1 API Demo Package
 

Utilities

SLIM-Suite Utilities

SLIM-Estimation 9.0 or 8.2 SmartSheets

The SLIM-Estimate® SmartSheets in these version specific packages provide a spreadsheet-style interface for interfacing with SLIM-Estimate version 8.2 or 9.0 using the SLIM-Estimate Application Programming Interface. Please note that you should download and use the SmartSheet package that corresponds to the SLIM-Estimate version you are currently running.  The Estimation SmartSheet combines the power of SLIM-Estimate with the flexibility and ease of use of a spreadsheet interface.  You can quickly produce estimates, generate Milestone, Project Summary, and Skills reports, apply a variety of customizable sizing techniques, and save the results to either Microsoft Excel or SLIM-Estimate 8.2 or 9.0 format.

SLIM-DataManager® 9.0 or 8.2 SmartSheets

The two SLIM-DataManager SmartSheets in these version specific packages provide a spreadsheet-style interface for interfacing with SLIM-DataManager version 8.2 or 9.0 using the DataManager Application Programming Interface. Please note that you should download and use the SmartSheet package that corresponds to the SLIM-Suite version you are currently running.  The Data Collection utility allows users to input data for a completed project via a spreadsheet based interface, then adds the project to a specified DataManager workbook.  The Data Extraction utility reads the contents of a SLIM-DataManager database and displays the data in spreadsheet format.

Agile Adjuster for SLIM-Suite 9.0 and 8.2

The Agile Adjuster updates a SLIM-Estimate workbook with new milestone and phase tuning values based on the project duration and Agile iteration length.   The utility can be called directly from within SLIM-Estimate using the extension menu option, making it easy to update the workbook whenever the solution changes.  Please note that you must use the Agile Adjuster version that corresponds to the SLIM-Suite version you are currently running. 

SLIM-MasterPlan Skill Aggregator

This Microsoft® Excel® based spreadsheet aggregates and displays Life Cycle staffing by skill data from the SLIM-Estimate subsystems associated with the current solution in a SLIM-MasterPlan workbook.   The utility can be added to MasterPlan as an extension menu item, so the update can be called directly from MasterPlan whenever the solution is changed.  This utility works with SLIM-Suite 9.0 and 8.2.

SLIM-MasterPlan Reader Utility

The MPReader utility is a command-line program that reads SLIM-MasterPlan workbook files and returns information about the subsystem files associated with a specific program in the workbook. This utility works with SLIM-Suite 9.0 and 8.2.

SLIM-Multi-Project Skill Aggregator

A Microsoft® Excel® based spreadsheet that aggregates and displays the Life Cycle staffing by skill data for all SLIM-Estimate workbooks in a specified folder. This utility works with SLIM-Suite 9.0 and 8.2.

 

Integrations

SLIM-Control-RTC Integration Packages

The SLIM-Control to RTC integration can be configured to retrieve information about defects and other metrics from an RTC repository and insert that information into the actual data contained in a SLIM-Control (.scw) workbook.

Licensed Users Only. Integration passwords available via the REQUEST PASSWORD link.
SLIM-Control 9.0-RTC Integration
SLIM-Control 8.2-RTC Integration
SLIM-Control 8.1-RTC Integration
 

Documentation, Templates, and Sample Workbooks

Documentation, Templates, and Samples

SLIM-Suite Documentation

These downloadable zip files contain the SLIM-Estimate, Control, DataManager, Metrics, MasterPlan, and Installation user guides for SLIM-Suite versions 9.0 or 8.2 in PDF format. Licensed Users Only.

SLIM-Suite Sample Workbooks

These downloadable zip files contain the full set of SLIM-Estimate, Control, Metrics, and DataManager sample workbooks that ship with SLIM-Suite version 9.0 or 8.2. Licensed Users Only.

SLIM-Suite Templates

These downloadable zip files contain the full set of SLIM-Estimate, Control, Metrics, and DataManager templates and sizing spreadsheets that ship with SLIM-Suite version 9.0 or 8.2. Licensed Users Only.

 

Training Files

SLIM-Suite Training Files

SLIM-Suite Exercise Files
This downloadable zip file contains the SLIM-Suite files used in training class exercises. Select the link for either v8.2 or v9.0 to download and save SLIM-Suite exercise files to either your 'My Documents\QSM\Tools82' or ‘My Documents\QSM\Tools90’ directory. Right-click on the .zip compressed file and select ‘Extract All.’