QSM Downloads

QSM Downloads

Install or Upgrade SLIM-Suite

SLIM-Suite 10.0, 9.0, or 8.2 Installation/Upgrade Files

Visit our Installation & Upgrades page to download setup files, release notes, installation manuals and instructions for installing or upgrading to SLIM-Suite 10.0, 9.0, or 8.2. For more information and a list of frequently asked installation questions, visit our Installation FAQs page.

 

SLIM-Suite APIs

SLIM-SUITE API (Application Programming Interface) Packages

Each version-specific package contains Documentation, API demo spreadsheets, and supporting workbooks for all three SLIM Suite API demos (Estimate, Control, and DataManager). Please download the package that corresponds to the version of SLIM-Suite you are currently running.

Licensed Users Only. API passwords available via the REQUEST PASSWORD link.
SLIM-Suite 10.0 API Demo Package
SLIM-Suite 9.0 API Demo Package
SLIM-Suite 8.2 API Demo Package
 

Utilities

SLIM-Suite Utilities

SLIM-Estimation SmartSheets

The SLIM-Estimate® SmartSheets in these version specific packages provide a spreadsheet-style interface for interfacing with SLIM-Estimate version 8.2, 9.0,  or 10.0 using the SLIM-Estimate Application Programming Interface. Please download and use the SmartSheet package that corresponds to the SLIM-Estimate version you are currently running.  The Estimation SmartSheet combines the power of SLIM-Estimate with the flexibility and ease of use of a spreadsheet interface.  You can quickly produce estimates, generate Milestone, Project Summary, and Skills reports, apply a variety of customizable sizing techniques, and save the results to either Microsoft Excel or SLIM-Estimate format.

SLIM-DataManager® SmartSheets

The two SLIM-DataManager SmartSheets in these version specific packages provide a spreadsheet-style interface for interfacing with SLIM-DataManager version 8.2, 9.0, or 10.0 using the DataManager Application Programming Interface. Please download and use the SmartSheet package that corresponds to the SLIM-Suite version you are currently running.  The Data Collection utility allows users to input data for a completed project via a spreadsheet based interface, then adds the project to a specified DataManager workbook.  The Data Extraction utility reads the contents of a SLIM-DataManager database and displays the data in spreadsheet format.

Agile Adjuster for SLIM-Suite

The Agile Adjuster updates a SLIM-Estimate workbook with new milestone and phase tuning values based on the project duration and Agile iteration length.   The utility can be called directly from within SLIM-Estimate using the extension menu option, making it easy to update the workbook whenever the solution changes. 

Please download the Agile Adjuster version that corresponds to the SLIM-Suite version you are currently running. 

SLIM-MasterPlan Skill Aggregator

This Microsoft® Excel® based spreadsheet aggregates and displays Life Cycle staffing by skill data from the SLIM-Estimate subsystems associated with the current solution in a SLIM-MasterPlan workbook.   The utility can be added to MasterPlan as an extension menu item, so the update can be called directly from MasterPlan whenever the solution is changed.  This utility works with SLIM-Suite 9.0 and 8.2.  SLIM-MasterPlan 10.0 incorporates robust Skills Allocation capabilities within the tool.

SLIM-MasterPlan Reader Utility

The MPReader utility is a command-line program that reads SLIM-MasterPlan workbook files and returns information about the subsystem files associated with a specific program in the workbook. This utility works with SLIM-Suite 9.0 and 8.2.

SLIM-Multi-Project Skill Aggregator

A Microsoft® Excel® based spreadsheet that aggregates and displays the Life Cycle staffing by skill data for all SLIM-Estimate workbooks in a specified folder. This utility works with SLIM-Suite 9.0 and 8.2.

 

Integrations

SLIM-Control-RTC Integration Packages

The SLIM-Control to RTC integration can be configured to retrieve information about defects and other metrics from an RTC repository and insert that information into the actual data contained in a SLIM-Control (.scw) workbook.

Licensed Users Only. Integration passwords available via the REQUEST PASSWORD link.

SLIM-Control 10.0-RTC Integration
SLIM-Control 9.0-RTC Integration
SLIM-Control 8.2-RTC Integration
 

Documentation, Templates, and Sample Workbooks

Documentation, Templates, and Samples

SLIM-Suite Documentation

These downloadable zip files contain the SLIM-Estimate, Control, DataManager, Metrics, MasterPlan, and Installation user guides for the following currently supported SLIM-Suite versions in PDF format. Licensed Users Only.

SLIM-Suite Sample Workbooks

These downloadable zip files contain the full set of SLIM-Estimate, Control, Metrics, and DataManager sample workbooks that ship with the following currently supported SLIM-Suite versions. Licensed Users Only.

SLIM-Suite Templates

These downloadable zip files contain the full set of SLIM-Estimate, Control, Metrics, and DataManager templates and sizing spreadsheets that ship with the following currently supported SLIM-Suite versions. Licensed Users Only.

SLIM-Suite 10.0 Sizing Resources

Documentation for SLIM-DataManager Sizing by Decomposition Templates. SLIM-DataManager ships with three new templates that use Custom Metrics and User Defined Variables to capture actual size data by component. Download the DataManager Decomposition Sizing Documentation files to learn more. Licensed Users Only.

Sizing by Decomposition Spreadsheet. SLIM-Suite tools provide the ability to call external programs via the Custom Menu Item feature. Download this Microsoft Excel spreadsheet to quickly access common Sizing by Decomposition methods that can be copied and pasted into SLIM-Estimate's Sizing Calculator. Licensed Users Only.

 

Training Files

SLIM-Suite Training Files

SLIM-Suite Exercise Files
This downloadable zip file contains the SLIM-Suite files used in training class exercises. Select the link for either v9.0 or v10.0 to download and save SLIM-Suite exercise files to either your 'My Documents\QSM\Tools90' or ‘My Documents\QSM\Tools100’ directory. Right-click on the .zip compressed file and select ‘Extract All.’