New Article: Using Parametric Estimation for Large-Scale IT Infrastructure Projects

Estimating Infrastructure

Large-scale IT infrastructure projects require an enormous amount of planning, design, configuration and testing to ensure that everything is working correctly and properly transitioned once the work is done. This takes time and resources. Like their software counterparts, IT infrastructure projects are more likely to be successful — more efficient, secure, and reliable — when accompanied by robust estimation and planning processes. In this article for, Larry Putnam, Jr. and Joe Madden identify best practices for applying parametric estimation to IT infrastructure projects.

Read the article!

Blog Post Categories 
Infrastructure Articles Estimation

Not Just for Software: How Estimation and Sizing Can Help You Plan a Successful IT Infrastructure Project

Estimation and Sizing for Infrastructure

This post was originally published on Linkedin. Join the QSM Linkedin Group and Company Page to stay up-to-date with more content like this.

While creating technology is about solving everyday problems, the act of creating technology is about solving design problems. This applies to any type of technology project, regardless of its purpose or size. Organizations must put as much thought and consideration into the design of their underlying IT infrastructures as they do in the design of their software projects. Both require careful sizing, estimation and planning.

Of course, installing, configuring and testing IT infrastructure is different than developing a piece of software. A typical IT infrastructure project could include:

  • Server room buildout (clean power, fire prevention, disaster recovery, cabling, etc.)
  • Network connectivity (local and wide area network)
  • Installation of computer server hardware (can be physical or virtual)
  • Configuration of system software on the servers (operating system, database, email server, web server, security template, etc.)
  • Configuration of computer desktops, laptops, smart phones. peripherals and other Internet of Things (IoT) devices 

Together, the hardware and software formulate a truly complex system where all of the parts are interconnected.

Blog Post Categories 
Estimation Sizing Infrastructure